HOME
|
DD
All
Tag
Groups
Search!
William-Black
— The Sands of Mars
Published:
2013-08-22 17:31:54 +0000 UTC
; Views:
2232
; Favourites:
18
; Downloads:
0
Redirect to original
Description
Full Resolution Digital Print: $7.00
Orders can be placed at wblack42@sbcglobal.net
See my profile page for details.
Image is part of a future historical setting, more detail is found on my profile page under the heading
Orion’s Arm Future History, A Synopsis. A Timeline Graph is to be found here:
Timeline.
The process of unloading the Cargo Carriers consumes the first weeks and months on Mars.
The first container’s open from the bottom, the entire bottom panel descending on tracks, a platform holding the heavy equipment required for further dismounting: heavy winches, powered lifts, fork trucks. Next come entire trucks designed to hydraulically lower or raise their cargo bearing beds, so freight may be transported, loaded or unloaded anywhere without benefit of a loading dock structure or ramp.
The Martians need to utilize every resource they’ve brought from Earth. Once unloaded the containers are tasked as temporary habitats – having been designed with punch-out panels and carrying pre-fitted window and airlock modules, and prefabricated interior partitions complete with wiring and plumbing.
For an image of the temporary container towns which spring up around the stripped cores of the Cargo Carriers, an image of the Mars Settlement a few months after the settler’s arrival is available here:
A Hard Day’s Night.
For a view of the Mars Settlement imaged within the first few years after landing see my image
Syria Planum Landing.
For a view of a domed Martian habitat imaged a hundred years post landing see my image:
Under The Domes at Nightfalls Edge.
For the Mars Settlement Project Complete Sequence, from final preparations prior to launch, including the launch of the Orion nuclear pulse spacecraft which transport the settlers to Mars, and a detailed depiction of Entry, Descent, and Landing, the following image link list will take you on the journey:
Right Before
Orion Nuclear Ground Launch
Terminus of an Arc
Propulsion Module/Entry Vehicle Separation
Piercing the Veil
Flight Control
A Sound of Thunder
Cue The Pyrotechnics
Riding The Fire
Over Noctis Labyrinthus
Terminal Descent
Related content
William-Black - Under The Martian Sky
William-Black - Gas Core Shutdown/5 Second Glide to Rollout
William-Black - First Flight
William-Black - Terminal Descent
William-Black - Syria Planum Landing
William-Black - Flyby-Orbiter Mission: Rendezvous
William-Black - Callisto Mission Crew Vehicle Launch
William-Black - Nuclear SSTO Reverse Thrust
William-Black - Periapsis: Racing The Clouds Of Jove
sixgun-fighter - Mars Rover Heads Home
DarrenStrecker - Red Seep 03 - Caught Red Handed
Paul-Lloyd - Empty Planet
CUTANGUS - Mars Rover Vehicle (I)
LePixx - Red Planet
Ludo38 - Mars dome 01
MASCH-ART - Mars Habitat - Spacestation
VITOGH - Crash Site
ralfmaeder - Mars Rover Excursion
Comments:
1
justin5578
[2013-08-22 17:32:54 +0000 UTC]
Very cool...
👍: 0 ⏩: 0